Wednesday, April 29, 2009

Almost the end!!!! But...

Though we are approaching the end of this major project, there are still little snafus that come up along the way... usually these involve return trips to Rona/Ikea/Home Depot to return unnecessary items or exchange incorrect pieces, but some are more serious, like the latest discovery:



Yep, that's a big crack in our new sink. The contractor will try to exchange it next week. Not quite sure how the crack got there...

Now onto the other new additions:

New toilet in master bathroom (dual flush!):


Medicine cabinet, faucets and vanity installed:




Close-up of faucets...


Shower doors nearly installed and all shower plumbing installed:


Awesome kitchen faucet and tiled backsplash:


And finally a great picture of the main area. Things to notice:
- new radiator under window
- painted walls
- tiling of backsplash
- dropped-ceiling lighting above the island
- sanded floors (to be varnished this week)


Almost there!

Thursday, April 16, 2009

Comptoir

This part is really exciting... they installed the countertop in the kitchen! It's Staron (the Samsung version of Corning's Corian), which is a composite material. We chose this because we wanted an undermounted sink and we did not want a joint in the giant slab that is on top of the island (which would have been the case if we went with quartz).

I think it looks superb!



A creative close-up shot:

Friday, April 10, 2009

On approche de la fin

Now it is the time when finishing touches are being done and the place is really taking shape!

Here are the new door handles installed on the (84") doors:


The kitchen is coming along - you can now see more cupboard doors, and the island taking shape in the center of the room.  Also notice the hood over the spot where the oven/stove will go (and the hole through the wall, through the brick, leading to outside!):



It's getting close to being done!

Saturday, April 4, 2009

On aime notre salle de bain!!!!!

Ah, the "piece de resistance"...

The bathroom has turned out really well, we are so impressed!
The vanity and medicine cabinet should arrive next week.



In our master bedroom we decided to go the Ikea route for closets (Pax). Two challenges include leveling the bottom of the closets, because the floor is crooked, and deciding what to do with the sides (either beef up the wall, put melamine planks, or use painted MDF along the sides. We chose the last option). Now if only I could reach the top shelves...